Herring River Restoration Project

Regulatory Oversight Group (ROG) Information

December 12, 2022 Meeting Materials and Meeting Access Information (PDF)

Update March 23, 2022

The Town of Wellfleet and Cape Cod National Seashore jointly filed a Notice of Intent with the Truro Conservation Commission for authorization of Phase 1 of the Herring River Restoration Project as an Ecological Restoration Limited Project. View the project application files:

Appendices, Including Project Design Plans

  • Appendix A: Project Design Plans
  • Appendix B: Agency Correspondence
  • Appendix C: Habitat Restoration and Monitoring Plan
  • Appendix D: List of Permits Required for Project
  • Appendix E: Wetlands Delineations
  • Appendix F: Combined Permit/401 Water Quality Cert.
  • Appendix G: Stream Crossing Photos
  • Appendix H: Operator and Maintenance Plans
  • Appendix I: Stormwater Reports
  • Appendix J: Hydrodynamic Studies
  • Appendix K: Groundwater Studies
  • Appendix L: Herring River Adaptive Management Plan
  • Appendix M: Design Alternatives for Class 1 Project Elements
  • Appendix N: Inland Wetland Restriction Order